Site & Soil Evaluation
Subgrade inspection, proof-rolling and a drainage plan before we set a single form board.
Kansas City sits on expansive clay that swells when wet and shrinks when dry. Get the subgrade, drainage and reinforcement right and your concrete lasts decades. Get them wrong and it cracks in two winters.
Subgrade inspection, proof-rolling and a drainage plan before we set a single form board.
Spread footings, stem walls, poured basement walls and slab-on-grade with engineered reinforcement.
Driveways, aprons, sidewalks, patios and approaches with proper thickness, base and joint layout.
Stamped, exposed aggregate, broom and polished finishes with integral or topical color.
Crack injection, helical piers, carbon-fiber strapping, mudjacking and drainage correction.
Grading, swales, French drains and downspout extensions that keep water off your foundation.
A sample of recent concrete & foundations work across the Kansas City metro.
We inspect soil, drainage, existing movement and access, then recommend repair or replacement honestly.
For structural work we bring in a licensed engineer and produce stamped drawings for permit.
Excavate to depth, proof-roll, place and compact granular base in lifts, then verify reinforcement.
Controlled water-cement ratio, vibration, screeding, joint cutting to depth, and proper curing.
Sealer applied after 28 days, with a joint and drainage review at the one-year mark.
Published ranges for the Kansas City market this year. Every project is quoted individually with a line-item scope and named allowances.
Driveways, patios, sidewalks and stoops, including base preparation and standard finishes.
$9 – $22 / sq ft Typical project rangeFootings, poured walls and slab-on-grade for new residential and light commercial construction.
$14,000 – $58,000 Typical project rangeCrack repair through full piering and drainage correction, based on engineering recommendations.
$3,200 – $42,000 Typical project rangeFinancing available through our lending partners with terms from 12 to 144 months on approved credit. Ask your project manager for a pre-qualification link.
Free site visit, honest budget conversation and a line-item written proposal within 7 to 10 business days. No obligation and no pressure.